SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - WELLHEAD AND FRAC TREE SYSTEMS
TED (EU)
Univerzita Karlova
Tsjekkia
10 mill. CZK
4. nov. 2026
Beskrivelse
This public contract concerns the supply of critical Long Lead Items - Wellhead and Frac Tree Systems - together with the related rental of installation tools and provision of installation services necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Part 2 of the Tender Documentation and in the draft Agreement contained in Part 3 of the Tender Documentation, including the Schedules thereto. For more details, please refer to the tender documents.
Oppføringen
Som publisert. Kunngjøringsteksten blir hos utgiveren.
Kjøper
Land
Tsjekkia
Regioner (NUTS)
Kategori
Maskiner til bergverksdrift, steinbrudd og bygg og anlegg · Mining and construction machinery43612400, 43612700, 43612000, 43130000
Kontraktsverdi
10 mill. CZK
Frist
4. nov. 2026
Publisert
30. sep. 2026
Språk
Čeština (Czech)
Kilde
TED (EU) · 674260-2026
Slik gir du tilbud
Prosedyre
Åpen anbudskonkurranse - alle kan levere tilbud
Lever tilbudet ditt her
https://tenderarena.cz/dodavatel/seznam-profilu-zadavatelu/detail/Z0002392
Språk for innlevering
ENG
Elektronisk innlevering
Påkrevd
Konkurransegrunnlag
Fritt tilgjengelig
Tildelingskriterier
Bid price, Technical Quality of the Proposed Solution
Hvordan tildelingen avgjøres
The bid price excluding VAT in accordance with Section 10 and Part 8 of the Tender Documentation, Technical Quality of the Proposed Solution
Kontraktsvilkår
Kontraktstype
Varer
Leveringssted
CZ042
Varighet
11 måneder
Tilbudet ditt må være gyldig i
6 måneder
Rammeavtale
Nei
Dynamisk innkjøpsordning
Nei
Alternative tilbud
Ikke tillatt
EU-finansiert
Ja
Kontakt oppdragsgiveren
E-post
administrace@krutakpartners.cz
Telefon
+420 777508984
Adresse
Ovocný trh 560/5, 11000, Praha - Staré Město
Kan firmaet ditt by på dette?
Lim inn et nettsted. Vi leser hva firmaet gjør og scorer det mot dette anbudet. Ingen konto.
Åpne anbud som dette
Rangert etter hva kunngjøringene handler om, ikke etter like ord i tittelen.
SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - LINER HANGER AND INSTALLATION SERVICES
TsjekkiaUniverzita Karlova
Stenger: 5. nov. 2026
The MaresConnect 750MW HVDC Interconnector System
IrlandMaresConnect Limited (MCL)
Stenger: 31. okt. 2026
The MaresConnect 750MW HVDC Interconnector System
IrlandMaresConnect Limited (MCL)
Stenger: 31. okt. 2026
Design, Manufacture, Supply and Installation of the Liquid Nitrogen (LN2) Transfer Line System for the Super-FRS Experiment Area
TysklandFAIR - Facility for Antiproton and Ion Research in Europe GmbH
Stenger: 28. okt. 2026
Fourniture et entretien de pompes de relevage et de vis de relevage pour l'usine de traitement des eaux usées AQUAPOLE Lot 1 _Fourniture et maintenance de pompes centrifuge supérieur à 30KW Lot 2 _Fourniture, maintenance et retrofit de vis de relevage Lot 3_ Fourniture et maintenance de motoréducteur des vis de relevage
FrankrikeGRENOBLE ALPES METROPOLE
Stenger: 9. nov. 2026
Kunngjøringsdataene er gjenbrukt fra offisielle kilder: Tenders Electronic Daily (TED), utgitt av Den europeiske unions publikasjonskontor i henhold til kommisjonsbeslutning 2011/833/EU; oeffentlichevergabe.de og TenderNed, publisert under CC0. Hver kunngjøring lenker til originalen, som er den versjonen som gjelder.
Se bare de som passer bedriften din
Kunngjøringer som denne kommer hver uke. Med en profil ser du dem bedriften din kan vinne, med poeng og én linje som forklarer hvert treff.
Start gratis