TII499 Luas Finglas Main Infrastructure Design and Construction Works
TED (EU)
Transport Infrastructure Ireland (TII)
Irland
250 mio. €
14. dec. 2026
Beskrivelse
Luas Finglas is a 4 km extension of the Luas Green Line, delivering a high-capacity light rail connection between Finglas and Dublin city centre to support sustainable transport and urban development. The scheme will serve communities including Charlestown, Finglas Village, Finglas West, St Helena’s, and the Tolka Valley, and will comprise four new stops at St Helena’s, Finglas Village, St Margaret’s Road, and Charlestown. It also includes a 350-space Park and Ride facility near St Margaret’s Road, as well as interchange opportunities with bus services and with mainline rail services at Broombridge. The Luas Finglas Main Infrastructure Design and Construction Works will be delivered under the NEC4 Engineering and Construction Contract (ECC) Option C (Target Cost with Activity Schedule). The scope of this Contract (TII-499) includes, but is not limited to, the design and construction of the following principal elements: 1. Site clearance and demolitions. 2. Track (trackbed and rails). 3. Luas Stops at St Helena’s, Finglas Village, St Margaret’s Road and Charlestown. 4. Broombridge stabling site works. 5. Park and Ride facilities at St Margaret's Road. 6. Royal canal and rail overbridge at Broombridge. 7. Tolka Valley Park Bridge. 8. Fencing, retaining walls, boundary treatments and accommodation work. 9. Utility services realignment, diversion, replacement, and protection. 10. Road realignments and junction modifications. 11. Pedestrian and cycling facilities including cycle storage structures. 12. Road traffic signalling. 13. Landscape and urban realm upgrades. 14. Overhead Catenary System (OCS). 15. Power and Systems infrastructure. 16. Signalling, controls and other rail systems. 17. Working in live traffic environment on the busiest radial corridors in the greater Dublin area including property and business frontage reconfiguration. 18. Heritage / archaeology mitigation works. 19. Installation of stop furniture. 20. Installation of Validators and Ticket Vending Machines. 21. Other Ancillary works. The successful Contractor will also be responsible for: • Overall systems integration. • Interfacing and co-ordinating with other works packages to facilitate completion of works. • Interfacing and co-ordinating with stakeholders. • Testing and commissioning.
Posten
Som offentliggjort. Bekendtgørelsesteksten bliver hos udgiveren.
Land
Irland
Regioner (NUTS)
Kategori
Bygge- og anlægsarbejder · Construction work · Architectural, engineering and inspection services45234100, 45000000, 45221000, 45220000, 45213000, 45213320, 45213321, 71242000, 71320000, 71300000, 71500000
Kontraktværdi
250 mio. €
Frist
14. dec. 2026
Offentliggjort
4. okt. 2026
Sprog
English
Kilde
TED (EU) · 684464-2026
Sådan byder du
Udbudsform
Begrænset udbud - du skal først ansøge om at deltage
Afgiv dit tilbud på
https://www.etenders.gov.ie/epps/cft/viewTenders.do?resourceId=9195113
Sprog for tilbuddet
ENG
Elektronisk afgivelse
Påkrævet
Udbudsmateriale
Frit tilgængeligt
Kontraktvilkår
Kontrakttype
Bygge- og anlægsarbejder
Udførelsessted
IE061
Varighed
54 måneder
Rammeaftale
Nej
Dynamisk indkøbssystem
Nej
EU-finansieret
Nej
Kontakt ordregiveren
Paul.Farrelly@tii.ie
Telefon
00 353 1 6463600
Adresse
Parkgate Business Centre, Parkgate Street, D08 DK10, Dublin
Hjemmeside
https://www.tii.ie/
Kan din virksomhed byde?
Indsæt et websted. Vi læser, hvad virksomheden gør, og scorer det mod dette udbud. Ingen konto.
Hvor stor er denne kontrakt?
Det samme tal måles to gange, fordi svaret afhænger af, hvorfra du byder.
Mod 6 sammenlignelige kontrakter åbne i hele Europa
nederste kvartil
midterste halvdel
øverste kvartil
Mod 2 åbne kontrakter med samme kode i Irland
Der er for få sammenlignelige kontrakter åbne lige nu til at placere dette imod dem.
Større end tre ud af fire sammenlignelige kontrakter.
Åbne udbud som dette
Rangeret efter hvad bekendtgørelserne handler om, ikke efter matchende ord i titlen.
9843 Design and Build Capacity Enhancement Works at Connolly Station
IrlandIarnród Eireann-Irish Rail
Lukker: 20. nov. 2026
Baltinglass Town Centre Refurbishment Project Phase 1A
IrlandWicklow County Council
Lukker: 18. nov. 2026
Dublin City Council Contract for Works Contractor for Public Realm and Building Works at Library Square Ringsend
IrlandDublin City Council
Lukker: 30. okt. 2026
Sport Ireland Minor Capital Works Multiparty Framework - Call off Competition for Lot 2 Lot 2 Civil Engineering Works
IrlandSport Ireland
Lukker: 28. okt. 2026
M700.CN.1025 - Soft Facilities Management Services for MetroLink (TII)
IrlandTransport Infrastructure Ireland (TII)
Lukker: 2. nov. 2026
Bekendtgørelsesdata genbruges fra officielle kilder: Tenders Electronic Daily (TED), udgivet af Den Europæiske Unions Publikationskontor i henhold til Kommissionens afgørelse 2011/833/EU; oeffentlichevergabe.de og TenderNed, udgivet under CC0. Hver bekendtgørelse fører til originalen, og det er originalen, der gælder.
Se kun dem, der passer til din virksomhed
Udbud som dette offentliggøres hver uge. Med en profil ser du dem, din virksomhed kan vinde, med score og en linje, der forklarer hvert match.
Start gratis