SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - WELLHEAD AND FRAC TREE SYSTEMS
TED (EU)
Univerzita Karlova
Czechia
CZK 10m
4 Nov 2026
Description
This public contract concerns the supply of critical Long Lead Items - Wellhead and Frac Tree Systems - together with the related rental of installation tools and provision of installation services necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Part 2 of the Tender Documentation and in the draft Agreement contained in Part 3 of the Tender Documentation, including the Schedules thereto. For more details, please refer to the tender documents.
The record
As published. The notice text stays with the publisher.
Buyer
Country
Czechia
Regions (NUTS)
Category
Machinery for mining, quarrying, construction equipment · Mining and construction machinery43612400, 43612700, 43612000, 43130000
Contract value
CZK 10m
Deadline
4 Nov 2026
Published
30 Sept 2026
Languages
Čeština (Czech)
Source
TED (EU) · 674260-2026
How to bid
Procedure
Open - anyone may submit a tender
Submit your tender at
https://tenderarena.cz/dodavatel/seznam-profilu-zadavatelu/detail/Z0002392
Submission language
ENG
Electronic submission
Required
Tender documents
Freely available
Award criteria
Bid price, Technical Quality of the Proposed Solution
How the award is decided
The bid price excluding VAT in accordance with Section 10 and Part 8 of the Tender Documentation, Technical Quality of the Proposed Solution
Contract terms
Type of contract
Supplies
Place of performance
CZ042
Duration
11 months
Your tender must stay valid for
6 months
Framework agreement
No
Dynamic purchasing system
No
Variant tenders
Not allowed
EU funded
Yes
Contact the buyer
administrace@krutakpartners.cz
Phone
+420 777508984
Address
Ovocný trh 560/5, 11000, Praha - Staré Město
Can your company bid for this?
Paste a website. We read what the company does and score it against this tender. No account.
Open tenders like this one
Ranked by what the notices are about, not by matching words in the title.
SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - LINER HANGER AND INSTALLATION SERVICES
CzechiaUniverzita Karlova
Closes: 5 Nov 2026
The MaresConnect 750MW HVDC Interconnector System
IrelandMaresConnect Limited (MCL)
Closes: 31 Oct 2026
The MaresConnect 750MW HVDC Interconnector System
IrelandMaresConnect Limited (MCL)
Closes: 31 Oct 2026
Design, Manufacture, Supply and Installation of the Liquid Nitrogen (LN2) Transfer Line System for the Super-FRS Experiment Area
GermanyFAIR - Facility for Antiproton and Ion Research in Europe GmbH
Closes: 28 Oct 2026
Fourniture et entretien de pompes de relevage et de vis de relevage pour l'usine de traitement des eaux usées AQUAPOLE Lot 1 _Fourniture et maintenance de pompes centrifuge supérieur à 30KW Lot 2 _Fourniture, maintenance et retrofit de vis de relevage Lot 3_ Fourniture et maintenance de motoréducteur des vis de relevage
FranceGRENOBLE ALPES METROPOLE
Closes: 9 Nov 2026
Notice data is reused from official sources: Tenders Electronic Daily (TED), published by the Publications Office of the European Union under Commission Decision 2011/833/EU; oeffentlichevergabe.de and TenderNed, published under CC0. Each notice links to the original, which is the version that governs.
See only the ones that fit your company
Notices like this one open every week. A profile puts the ones your company can win in front of you, scored, with a line explaining each match.
Start free