Cleaning and gauging (HYRER/HYREL)
Germany (oeffentlichevergabe.de)
GASCADE Gastransport GmbH
Germany
19 Nov 2026
Description
For the pipeline sections 1 to 3 mechanical cleaning using i.e. bi-directional cleaning pigs is considered. Four (4) cleaning pig runs shall be assumed to be required per pipeline section. For the very first cleaning pig run per section a bi-directional pig must be offered which shall proof pig passage by either mechanical or intelligent gauge plate(s). For the pipeline sections 1 to 3 mapping of the pipeline is considered over the entire section or a to be determined sub-section of it. A minimum of twenty (20) AGMs must be provided per section. Inertial measurement data are considered for bending strain analysis which shall be offered as a combined service. For the pipeline sections 1 to 3 the following pipeline anomalies shall be addressed by ILI technologies: Offered services shall consider internal and external metal-loss detection and sizing in straight pipe, field- and hot-bends. In case a combination of ILI technologies implemented on one or more ILI tools which enable a combined data analysis leading to a superior perfor-mance compared to individual ILI technologies, the technologies shall be offered as a com-bined service and shall be emphasized as such. Offered services shall consider detection and sizing of geometric deviations from the norm of straight pipe and in bends. Offered services shall consider detection and sizing of axially oriented crack and crack-like anomalies. The definition of terms is according to the publicly available Pipeline Operators Forum Recommended Practice POF 100 edition 2021. Offered services shall consider detection and sizing of localized variations of the pipe materi-al hardness with respect to the mean material hardness per joint and exceeding an upper and lower bound threshold depending on the offered tool performance. Offered services shall consider detection of pipe material yield strength variation per joint with respect to available pipe material records per joint. Offered services shall consider measurement of the axial strain along the entire section lengths. The service shall be offered as a combined service of ILI, strain-based Fitness-For-Service assessment and, if possible, a total strain assessment including bending strain as-sessment results (see Lot 2). Pipe samples and pipe sample data can be provided upfront if needed to enhance the offered performance. For pipeline section 4 mechanical cleaning using i.e. bi-directional cleaning pigs is consid-ered. Four (4) cleaning pig runs shall be assumed to be required per pipeline section. For the very first cleaning pig run per section a bi-directional pig must be offered which shall proof pig passage by either mechanical or intelligent gauge plate(s). For pipeline section 4 mapping the pipeline is considered over the entire section or a to be determined sub-section of it. A minimum of twenty (20) AGMs must be provided. Inertial measurement data are considered for bending strain analysis which shall be offered as a combined service. Offered services shall consider internal and external metal-loss detection and sizing in straight pipe, field- and hot-bends. In case a combination of ILI technologies implemented on one or more ILI tools which enable a combined data analysis leading to a superior perfor-mance compared to individual ILI technologies, the technologies shall be offered as a com-bined service and shall be emphasized as such. Offered services shall consider detection and sizing of geometric deviations from the norm of straight pipe and in bends. Offered services shall consider detection and sizing of axially oriented crack and crack-like anomalies. The definition of terms is according to the publicly available Pipeline Operators Forum Recommended Practice POF 100 edition 2021. Offered services shall consider detection and sizing of localized variations of the pipe materi-al hardness with respect to the mean material hardness per joint and exceeding an upper and lower bound threshold depending on the offered tool performance. Offered services shall consider detection of pipe material yield strength variation per joint with respect to available pipe material records per joint. Offered services shall consider measurement of the axial strain along the entire section lengths. The service shall be offered as a combined service of ILI, strain-based Fitness-For-Service assessment and, if possible, a total strain assessment including bending strain as-sessment results (see Lot 10). Pipe samples and pipe sample data can be provided upfront if needed to enhance the offered performance.
The record
As published. The notice text stays with the publisher.
Country
Germany
Regions (NUTS)
Category
Deadline
19 Nov 2026
Published
19 Oct 2026
Languages
English
Procedure
Restricted procedure
Source
Germany (oeffentlichevergabe.de) · bd8b9eae-b195-4f4b-92e3-91945010d959
Can your company bid for this?
Paste a website. We read what the company does and score it against this tender. No account.
Open tenders like this one
Ranked by what the notices are about, not by matching words in the title.
Evakuierungsarbeiten von Pipelines zum Gastransport, Abfackeln von Restmengen, Inertisieren von Pipelines zum Gastransport Im Rahmen einer nicht abschließenden Rahmenvereinbarung
GermanyGASCADE Gastransport GmbH
Closes: 26 Oct 2026
Framework Agreement for Trenchless Lining of Sewer Pipelines
ISVeitur ohf.
Closes: 18 Jan 2027
Technische Planung zur Pre-Feed Readiness der Offshore Wasserstoff-Pipeline HYBHC
GermanyGASCADE Gastransport GmbH
Closes: 4 Nov 2026
Peilungen und Strömungsmessung FSRU WHV02
GermanyDeutsche Energy Terminal GmbH (DET)
Closes: 26 Oct 2026
SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - LINER HANGER AND INSTALLATION SERVICES
CzechiaUniverzita Karlova
Closes: 5 Nov 2026
Notice data is reused from official sources: Tenders Electronic Daily (TED), published by the Publications Office of the European Union under Commission Decision 2011/833/EU; oeffentlichevergabe.de and TenderNed, published under CC0; BOAMP, published under the Licence Ouverte 2.0; Find a Tender, published under the Open Government Licence v3; and e-Zamówienia, the Plataforma de Contratación del Sector Público and the Piattaforma di Pubblicità a Valore Legale published by ANAC, Doffin and Hilma, published by their national authorities. Each notice links to the original, which is the version that governs.
See only the ones that fit your company
Notices like this one open every week. A profile puts the ones your company can win in front of you, scored, with a line explaining each match.
Start free