D0440 EFU-10978 Sandbrekkevegen residential centre and rental housing, turnkey contractor
TED (EU)
Bergen Kommune
Norway
15 Jan 2027
Description
Sandbrekkeveien residential centre shall be an institution with 15 resident rooms divided between two departments. A long term department with 9 rooms and a short-term department with 6 rooms, each of the departments shall have the accompanying outside areas. The resident group will be persons who have a decision on 24 hour care in age groups 18-30 years. The resident group has severe functional declines due to mental challenges diagnosed with developmental disturbances, or autism spectrum disturbance with low function levels. The building shall also include the necessary personnel facilities connected to the department and in the personnel base. The outside area shall provide a sheltered patio for residents. The site has a recently approved zoning plan from 2024. This is developed for a residential centre with 9 flats with associated personnel areas, as well as 8 ordinary rental residences. This concept has been adopted changed to what is the basis of this project. It must be expected that in the interaction phase one must consider, as well as seek dispensation from parts of this if this proves necessary. For this turnkey contract, the builder has set a cost cap of NOK 83,053 million excluding VAT, both the contract ́s phases 1 and 2 shall be carried out within this cost cap.
The record
As published. The notice text stays with the publisher.
Buyer
Country
Norway
Regions (NUTS)
Category
Construction work · Architectural, engineering and inspection services45000000, 45210000, 45215200, 45220000, 71240000, 71320000
Deadline
15 Jan 2027
Published
17 Nov 2026
Languages
English
Source
TED (EU) · 798638-2026
How to bid
Procedure
Open - anyone may submit a tender
Submit your tender at
https://app.artifik.no/procurements/10564
Submission language
NOR
Electronic submission
Required
Tender documents
Available on request
How the award is decided
Price, Environment - non-slip construction site, Environment - materials, In this procurement, the award criteria are combined with climate and environmental requirements in the requirement specification. The contracting authority has assessed the project ́s climate and environmental impact and concluded that it would be better to set requirements in this procurement rather than use the 30 percent award criteria, cf. the Public Procurement Act § 5b. The justification for this will be reviewed below. In accordance with the Public Procurement Act § 5b, the Contracting Authority shall, as a main rule, weight climate and environment considerations with at least 30 percent. In accordance with § 5b second paragraph of the third period, this weighting can be replaced with climate and environmental requirements in the requirement specification alone or combined with the award criteria with a lower weight than 30%, if this gives better climate or environmental effect, and the reasoning is stated in the procurement documents. The following activities have been carried out to map the climate and environmental impact of the procurement: Review of planned work and assessment of extent and environmental impact in consultation with internal climate and environmental adviser. Due to a price and design contest (build to cost), the choice of systems is up to the contractor. Assumptions have therefore been made for what could be climate and environmental impact. From the climate and environment analysis, these climate and environmental considerations have been identified: * Materials: particularly concrete for floors on the ground and foundations, vinyl, gypsum and plywood. * Energy in operation: Energy consumption for room heating, tap water, ventilation, lighting and equipment throughout the lifetime of the project. * Construction site including mass transport: The climate and environmental impact makes up 100% of the direct emissions to air, and affects the surrounding area with a significant amount of noise and particles for air. Priorities will be given to measures that limit the climate footprint for the above mentioned emission posts, through the use of requirements and award criteria. A mapping of the market through the EFU ́s ongoing and executed construction projects has been carried out in order to assess the level of ambition and cost, as well as obtain knowledge on what can be offered in the region. Based on the above mentioned analyses and activities, the following requirements and award criteria are set in the project. * Requirement for 10% lower energy consumption than TEK17 energy framework model. * Option for future retrofitting and expansion of solar panel installations (planning and physical measures). * Requirement for climate gas calculations. * Requirement for circularity analysis/index in accordance with FutureBuilt. * Requirement 90% source sorting (70% in TEK 17). * Requirement for emission free vehicles. * The objective of maximum waste quantities. * Requirement for low-emitting materials. * Requirements for the absence of environmental toxins. * Requirement for legally carved wood. * Requirement for discharge free building heating and drying. * Requirements to safeguard flora. * Requirement for 20% re-use of ventilation channels. * Requirement for 20% re-use of cable bridges/channels. Award criteria: * 5% Maximum CO2 emissions for materials, with emphasis on concrete. * 10% Maximum diesel quantities. EFU believes it is clear that these requirements provide better climate and environmental effect than 30 % weighting because: In this competition the contracting authority has chosen to have comprehensive requirements as to how the construction work is carried out, as well as systems that limit the climate and environmental impact of the building's lifetime. Using requirements that are considerably stricter than the minimum requirements in TEK 17, the Contracting Authority ensures that all tenderers fulfil all environmental requirements, and thus achieve better climate and environmental effect than if the tenderers have the freedom to fulfil one or several of the environmental requirements in their tender offer and where it had to be assessed as part of the tender evaluation. Furthermore, it is the entirety of fulfilment of these requirements that give the best climate and environmental effect in order to reduce the largest emission drivers in the construction project. The contracting authority therefore believes that it will be clearly better to combine requirements and award criteria in this procurement.
Contract terms
Type of contract
Works
Place of performance
NO0A2
Duration
25 months
Your tender must stay valid for
166 days
Framework agreement
No
Dynamic purchasing system
No
EU funded
No
Legal basis
32014L0024
Contact the buyer
hovedpostmottak@bergen.kommune.no
Phone
+47 05556
Address
Rådhusgaten 10, 5014, Bergen
Website
https://www.bergen.kommune.no/
Contact point
Adanc, Agnes Dåvøy
Can your company bid for this?
Paste a website. We read what the company does and score it against this tender. No account.
Open tenders like this one
Ranked by what the notices are about, not by matching words in the title.
Turnkey contract for demolition and new construction - qualification phase
NorwaySpro Eiendom AS
Closes: 30 Nov 2026
U2940 EFU-10988 Storetveit school - procurement of a turnkey contractor
NorwayBergen Kommune
Closes: 11 Jan 2027
Notice data is reused from official sources: Tenders Electronic Daily (TED), published by the Publications Office of the European Union under Commission Decision 2011/833/EU; oeffentlichevergabe.de and TenderNed, published under CC0; BOAMP, published under the Licence Ouverte 2.0; Find a Tender, published under the Open Government Licence v3; and e-Zamówienia, the Plataforma de Contratación del Sector Público and the Piattaforma di Pubblicità a Valore Legale published by ANAC, Doffin and Hilma, published by their national authorities. Each notice links to the original, which is the version that governs.
See only the ones that fit your company
Notices like this one open every week. A profile puts the ones your company can win in front of you, scored, with a line explaining each match.
Start free