Bridge maintenance Telemark 2027-2028

Telemark fylkeskommune

Norway

6 Jan 2027

Description

The nature and scope of the work The assignment includes maintenance work on bridges in Telemark county. The work shall be carried out on 13 fixed bridges. The contract also includes process based work under Bridge 50. The contract will be valid from when the contract is signed until 31.12.2028, with an option for an extension for up to 2 x 12 months. More information can be found in the attached tender documentation. If there is discrepancy between the information in Hyyr and the attached tender documentation (chapter A-E including annex), the attached tender documentation ranks before the other information in Hyyr. Tender conference A tender conference will be held: 23.11.2026, kl. 09.00, i Torggata 18, 3717 Skien, meeting room Bandak 3rd floor.

The record

As published. The notice text stays with the publisher.

Country

Norway

Regions (NUTS)

Telemark

Category

Construction work · Construction structures and materials · Repair and maintenance services · Architectural, engineering and inspection services45221000, 45221100, 44212100, 45221111, 45233141, 50230000, 71322300

Deadline

6 Jan 2027

Published

12 Nov 2026

Languages

English

Source

TED (EU) · 787419-2026

How to bid

Procedure

Open - anyone may submit a tender

Submit your tender at

https://hyyr.no/procurement/cmvthpgoo000007l8butnvfcx

Submission language

NOR

Electronic submission

Required

Tender documents

Freely available

Award criteria

Price, Climate and environment

How the award is decided

Under this criterium the price element will be assessed., The Public Procurement Act § 5b states that public procurements should weight climate and environmental considerations with a minimum of 30%. This is done through award criteria. If there is a better climate or environmental benefit, the award of contract can be replaced or combined with climate and environmental requirements. The award of climate and environmental considerations (30 %) is not relevant in this contract and is replaced by the requirements for materials and passenger transport, see the requirement specifications in C chapter and under respective processes for the factory concrete. Justification: Based on emission factors given in VegLCA and previously reported amounts on consumption, steel (railings) contributes with 35%, concrete 12% and passenger transport 13% of the total emissions of 337 tonnes CO2-ekv. Despite the fact that steel makes up the largest share of the total emissions, it is considered as limited possibilities for reduction - especially compared to other major emission factors - through competition or requirements in this contract. Concrete cast on site is the second largest emission factor in accordance with the result in VegLCA. As concrete in low carbone class 40 is available in the market for the contract, minimum requirements can be made as a part of the tender documentation. This will ensure that the contract will get concrete delivered with the lowest possible emissions, based on what is available in the market for the notice. Such a requirement will ensure that the contract will have good climate effect by reducing the climate gas footprint from the second largest climate driver in the contract by 40% (16.4 tonne co2-ekv.), compared with industry references. If the project instead chooses to premiere the use of low carbon concrete through the award criteria, the same climate gas reduction cannot be guaranteed. It is therefore considered better to set requirements for the use of low carbon concrete as this will give the lowest greenhouse gas emissions based on the available materials in the market at the time of the notice. Passenger transport makes up 13% of the total emissions, and is the second largest contributor to CO2 emissions. A minimum requirement will ensure that a large number of light vehicles offered and used are emission free. An award criteria will award zero emissions, but price or other award criteria could nevertheless lead to the contract being awarded to a supplier who offers fossil-driven vehicles. The market for emission free light vehicles is considered to be sufficiently mature and there is an available charging infrastructure and the necessary capacity. By requiring 90% of driven km to be emission free, the contract achieves a further reduction of 37 tonne of CO2-ekv. See annex 2026-11-04 Award of Climate and Environment new bridge contract for detailed justification for choosing the requirements.

Contract terms

Type of contract

Works

Place of performance

NO094

Your tender must stay valid for

46 days

Framework agreement

No

Dynamic purchasing system

No

EU funded

No

Maximum renewals

2

Legal basis

32014L0024

Contact the buyer

Email

post@telemarkfylke.no

Phone

+47 35 91 70 00

Address

Torggata 18, 3718, Skien

Contact point

Telemark fylkeskommune

Can your company bid for this?

Paste a website. We read what the company does and score it against this tender. No account.

Open tenders like this one

Ranked by what the notices are about, not by matching words in the title.

Notice data is reused from official sources: Tenders Electronic Daily (TED), published by the Publications Office of the European Union under Commission Decision 2011/833/EU; oeffentlichevergabe.de and TenderNed, published under CC0; BOAMP, published under the Licence Ouverte 2.0; Find a Tender, published under the Open Government Licence v3; and e-Zamówienia, the Plataforma de Contratación del Sector Público and the Piattaforma di Pubblicità a Valore Legale published by ANAC, Doffin and Hilma, published by their national authorities. Each notice links to the original, which is the version that governs.

See only the ones that fit your company

Notices like this one open every week. A profile puts the ones your company can win in front of you, scored, with a line explaining each match.

Start free