Framework agreement bridge maintenance Innlandet and Buskerud 2027-2028
TED (EU)
Statens vegvesen
Norway
NOK 280m
26 Nov 2026
Description
The procurement is for a framework agreement for bridge maintenance in the geographical areas Innlandet and Buskerud. The framework agreement includes assignments such as: * Work notification Concrete renovation * Cutting cast land abutment and pillars, retaining wall work, edge binders, concrete sole layer, spray lubrication etc. * Width expansion of bridge plates and land abutments for existing bridges. Alterations to the superstructure. Repairs and replacements of existing railings and assembly of new bridge railings, including railing transitions, branches and end terminations. * Surface treatment of steel and concrete. * Removal of existing and assembly of new drainage pipes. * Repair of joints and joints. * Replacement of asphalt joints and metal joints. * Establishment of simple asphalt and rice-reading joints * Asphalt works * Replacement of membrane and wearing course. The assignments will vary in scope and comprise different maintenance work that is not already included in operational contracts or other maintenance contracts. The work included in the framework agreement is mainly for maintenance work. If there is a need for more comprehensive maintenance work and alteration work on individual bridges, this can be announced as separate contracts. Tenderers must also take an active role in the bridge maintenance and report any damage that is observed on bridges on behalf of the assignment. Such injuries are reported continuously. The amounts stated in chapter 1 are: D1 is based on experiences from previous contracts. The stated amounts are estimated amounts for the expected maintenance need for two years. However, the stated amounts are uncertain. The duration of the framework agreement is from signing of contract until 31.12.2028 The procurement is being announced with an option for a 1+1 year extension. The notice for triggering the first option will be given in writing and at the latest three months before the framework agreement expires. The same notification rules apply for triggering new options. The estimated value of the framework agreement in 2027 is NOK 40- 70 million excluding VAT. The estimated annual value later this year is NOK 40 - 70 million excluding VAT. The maximum value of the framework agreement is NOK 280 million. Excluding VAT.
The record
As published. The notice text stays with the publisher.
Buyer
Country
Norway
Category
Construction work45000000, 45221100, 45233200, 45223000, 45262330
Contract value
NOK 280m
Deadline
26 Nov 2026
Published
26 Oct 2026
Languages
English
Source
TED (EU) · 741144-2026
How to bid
Procedure
Open - anyone may submit a tender
Submit your tender at
https://app.artifik.no/procurements/10462
Submission language
NOR
Electronic submission
Required
Tender documents
Available on request
How the award is decided
Lowest price, The procurement is for a framework agreement for bridge maintenance Innlandet and Buskerud 2027-2028. According to loa § 5b, the contracting authority shall take climate and environment into account in all procurements in order to reduce the procurement ́s total climate footprint and environmental impact. In procurements, the contracting authority that weights the award criteria, shall weight climate and environmental considerations with a minimum of thirty percent. If the contracting authority sets the award criteria in prioritised order, climate and environment considerations should be among the three highest prioritised. Award criteria for climate and environment can be replaced or combined with climate and environmental requirements in the requirement specification if this gives a better climate or environmental effect. This shall be justified in the procurement documents. The climate and environmental impact of this procurement is mainly related to: • Materials. Mainly concrete and steel. • Transport of personnel. • Heavy diesel driven vehicles and machines. • Waste management services. From the contracting authority ́s assessment, the minimum requirements set in the contract terms will give a better climate effect by ensuring that the winning tenderer ́s fulfils the climate and environmental requirements which are set which is something that is not sure by weighting equivalently with the award criteria. It is not known at the time of publication which bridges are included in the framework agreement. The work will be carried out on bridges with a very varying location and extent. Bridge works will be carried out in both densely populated areas with good access to infrastructure and charging facilities and in areas with very long transport distances and limited access to charging infrastructure. At the time of publication, it will be unknown how much will be covered by each individual the call-offs, the extent of the work or which conditions will apply. It has been assessed that it would be challenging to prepare realistic and documentable climate and environmental measures such as can be evaluated as the award criteria for all possible future call-offs under the framework agreement. There is also a significant amount of non planned assignments in the framework agreement as a result of unforeseen events on the road network. (the driveway of bridge elements, snow clearing damage, loose joint elements, flood damage etc.) Materials Concrete - The concrete shall fulfil a minimum of low carbon concrete 20 in accordance with Norwegian. Concrete Association Publication no. 37: Low carbon concrete. This concrete is required to be used in all cases where this does not go beyond the structural characteristics of concrete and where this is professionally responsible. See also the requirements for emissions set in the Norwegian Concrete Association publication no. 37 Low carbon concrete from October 2025. By setting requirements on using low carbon concrete where professionally responsible, we ensure the lowest possible emissions. Transport of personnel All light vehicles shall be 90% emission free. Light vehicles means passenger cars (M1/M1G), Light goods van (N1/N1G). Emission free means vehicles that have progress based on fully electric or hydrogen. The above requirements do not apply to the use of vehicles for transport to, from and between work places that not be paid separately. The point is taken care of in chapter C2 Special contract terms, point 34 Vehicle Requirements. Setting the minimum requirements gives a better climate effect by ensuring that the winning tenderer ́s comply with the climate and environmental requirements set which is something that is not certain weighting equivalently with award criteria. Heavy diesel powered vehicles and machines Requirements for vehicles and machines: The contract requires that all diesel driven vehicles are required. and machines that are used in the contract shall, at a minimum, have EURO 6 and STEP 4. approval. See C4 special contract terms for the contract, point 4.3. Absorption agents are required in C2 point 30.9. Waste Management Waste management makes up a very small part of the contract. It mostly involves the delivery of concrete and reinforcement for a certified landfill. As the process is taken care of in C2 Special Contracts provisions point 30.5 and contractors in reality cannot compete on the assessed use of minimum requirements results in a better climate and environmental effect by ensuring that the winning tenderer ́s comply with the climate and environmental requirements set. Conclusion There are mainly very strict requirements for external environments and emissions when performing bridge maintenance through requirements in the tender documentation and regulations that it would not be appropriate to do so as a part of the award criteria. By setting minimum requirements in the contract, we are largely ensured a climate and environmental effect and we therefore consider the climate and environmental gains in this procurement to be better safeguarded through such a requirement position rather than the use of climate and environment as the award criteria.
Contract terms
Type of contract
Works
Place of performance
NO085, NO020
Your tender must stay valid for
2 months
Framework agreement
Yes, without reopening competition
Dynamic purchasing system
No
EU funded
No
Maximum renewals
2
Legal basis
32014L0024
Contact the buyer
firmapost@vegvesen.no
Phone
+47 22073000
Address
Innspurten 11C, 0663, Oslo
Website
https://www.vegvesen.no
Contact point
Tine Maria Storhaug
Can your company bid for this?
Paste a website. We read what the company does and score it against this tender. No account.
How big is this contract?
The same figure measured twice, because the answer differs depending on where you bid from.
Against 128 comparable contracts open across Europe
lower quarter
middle half
upper quarter
Against 128 open under the same code in Norway
lower quarter
middle half
upper quarter
Larger than three in four comparable contracts.
Open tenders like this one
Ranked by what the notices are about, not by matching words in the title.
2026/1789 - Framework agreement with one tenderer for the operation and maintenance of lift facilities for properties in Agder.
NorwayStatsbygg
Closes: 26 Nov 2026
Framework agreement for construction works for hamar, stange and ringsaker areas.
NorwayINNLANDET FYLKESKOMMUNE
Closes: 13 Nov 2026
Notice data is reused from official sources: Tenders Electronic Daily (TED), published by the Publications Office of the European Union under Commission Decision 2011/833/EU; oeffentlichevergabe.de and TenderNed, published under CC0; BOAMP, published under the Licence Ouverte 2.0; Find a Tender, published under the Open Government Licence v3; and e-Zamówienia, the Plataforma de Contratación del Sector Público and the Piattaforma di Pubblicità a Valore Legale published by ANAC, Doffin and Hilma, published by their national authorities. Each notice links to the original, which is the version that governs.
See only the ones that fit your company
Notices like this one open every week. A profile puts the ones your company can win in front of you, scored, with a line explaining each match.
Start free